Advanced Process Control (APC) & Real-Time Optimisation
Advanced Process Control and Optimisation That Stays Switched On
Scheduled Dates
| Date | Venue | Delivery | Fees | |
|---|---|---|---|---|
| 21 - 25 Mar 2027 | Jeddah - Saudi Arabia | Face-to-Face | USD 3,895 per delegate | Book |
| 14 - 18 Jun 2027 | Hong Kong - Hong Kong | Face-to-Face | USD 3,895 per delegate | Book |
| Date | Venue | Delivery | Fees | |
|---|---|---|---|---|
| 21 - 25 Mar 2027 | Jeddah - Saudi Arabia | Face-to-Face | USD 3,895 per delegate | Book |
| 14 - 18 Jun 2027 | Hong Kong - Hong Kong | Face-to-Face | USD 3,895 per delegate | Book |
No dates are currently scheduled for this delivery mode.
Course Introduction
APC projects commonly deliver benefit for six months and then get switched off, because models drift, operators lose confidence, and nobody owns maintenance of the controller. This five-day course covers the full lifecycle: base layer control health first, then model identification, controller design, commissioning, and the sustainment practice that keeps an APC application running and delivering years later.
Course Highlights
Fix base layer control before attempting advanced control
Identify process models from plant testing
Design and tune multivariable controllers
Commission APC with operator confidence
Sustain benefit through monitoring and maintenance
Course Objectives
Assess base layer control performance and correct deficiencies
Plan and execute plant step testing safely
Identify dynamic models from test data
Configure multivariable predictive controllers
Design real-time optimisation layers and their interaction
Establish performance monitoring and sustainment practice
Training Methodology
The course is delivered through short instructor-led inputs followed immediately by applied practice. Participants work on structured exercises, worked examples and case material drawn from real situations, with facilitated discussion throughout. Delegates are encouraged to bring their own data, documents or scenarios, and time is set aside each day to apply the material to their own organisation.
Organisational Impact
APC benefit sustained rather than decaying
Base layer control problems fixed first
Operators who trust and use the controller
Measurable economic benefit maintained
Personal Impact
Full-lifecycle APC capability
Model identification and controller design skill
Commissioning and operator engagement experience
Positioning for advanced control roles
Who Should Attend
Process control and automation engineers
Process engineers working on optimisation
Operations and technical services staff
Control system specialists
Engineers supporting APC applications
Course Outline
Base Layer Control
Why APC fails: the base layer problem
Loop performance assessment and tuning
Valve, instrumentation and constraint issues
Control strategy prerequisites
Workshop: assessing loop performance
Model Identification
Process dynamics and model forms
Step testing design and safe execution
Model identification from test data
Model validation and uncertainty
Workshop: identifying models from data
Controller Design
Multivariable predictive control principles
Controller configuration and tuning
Constraint handling and prioritisation
Economic objectives within the controller
Workshop: configuring a controller
Optimisation and Commissioning
Real-time optimisation and its interaction with APC
Commissioning sequence and operator engagement
Benefit estimation and measurement
Handover and operator training
Workshop: commissioning planning
Sustainment
Performance monitoring and degradation signals
Model maintenance and re-identification
Ownership, skills and support structures
Benefit tracking and reporting
Action planning for existing applications
Certificate
Delegates who complete the programme receive a MAWA Events Certificate of Attendance, recording the course title, dates, venue and training hours completed.